+ shipping.
You will get a full evaluation report, with an executive summary of our findings and recommendations for action if needed. You also will get full train operating and history summaries and graphs, as well as copies of your raw data and
MASAR® Fouling & Performance Monitoring
results in MSAccess® database files on a CD-ROM.
Data Requirements
View Full List
1. Train's membrane system design parameters or standard conditions.
2. Monthly train operating data (same as rerquired by ASTM D 4516-00
standard method)
Data files are accepted in any electronic format such as any membrane manufacturer's normalization program (NormPac®, NormPro®, RODATA®, ROSA®, etc.), any database or spreadsheet (MSAccess®, dBase®, MSExcel®, Lotus123,ROSA®, text-delimited files, etc.). These files can be transmitted via electronic mail or sent on floppy disks or CD-ROM's. Manual written data sheets are also accepted as hard copies if complete and legible. A limit of 2 data sets per train per day and additional charges apply as stated below.
Confidentiality of Data
Total confidentiality of design and operating data are guaranteed by MASAR Technologies.
We will strictly observe customer restrictions on public access and usage of data and related results based on data analysis for publications,
demonstration and promotional purposes, and will secure the customer's advance approval before any such data can be used (anonymously or otherwise)
for any other purpose aside from analysis and evaluation.